Created on 05.06

CHINA'S CHAOHU-MA'ANSHAN HSR LAUNCHES 927-TON SUPER GIRDER

0
On Monday, the inaugural 40.6-meter/927.3-ton box girder was successfully installed on Chaohu-Ma'anshan HSR in Anhui Province. As a vital section of Shanghai-Chongqing-Chengdu HSR corridor, this 76km railway (design speed: 350km/h) will soon stride across the Yangtze River.

0

Integrated Solutions

  • First Girder: Hoisted by China's most powerful lifting gantry
  • Full Project: Subsequent spans by HCR's DJ1000 Beam Erector
Technical Edge:
✓ Engineered for 40m-span/1000-ton girders
✓ Mastered complex bridge-tunnel transitions✓ Proven in Hangzhou-Quzhou/Hangzhou-Shaoxing-Taizhou HSR

Turnkey Services

HCR delivers end-to-end heavy girder construction solutions:
Customized Equipment: 70-year expertise ensures cost-effective machinery
Technical Support: Design documentation, third-party drawing review, on-site supervision
Engineering Consultation: Complimentary troubleshooting for complex scenarios
Portfolio: DJ1000 series deployed in multiple Chinese mega-projects

HOME

Our self-developed DJ series is now on sale

TIMELINE WITH US

OUR CLIENTS

our Partner

PRODUCTS

ABOUT  US

CONTACT US

Fully Automatic Brick Making Machine

Semi-Automatic Brick Making Machine

Hollow Brick Machine

Hydraulic Brick Making Machine

Company Profile

Our Team by the numbers

Who We Are

Contact Us

Price is in US dollars and excludes tax and handling fees

© 2024 LingXi Ltd. Trademarks and brands are the property of their respective owners.

Global Presence