On Monday, the inaugural 40.6-meter/927.3-ton box girder was successfully installed on Chaohu-Ma'anshan HSR in Anhui Province. As a vital section of Shanghai-Chongqing-Chengdu HSR corridor, this 76km railway (design speed: 350km/h) will soon stride across the Yangtze River.
Integrated Solutions
- First Girder: Hoisted by China's most powerful lifting gantry
- Full Project: Subsequent spans by HCR's DJ1000 Beam Erector
Technical Edge:
✓ Engineered for 40m-span/1000-ton girders
✓ Mastered complex bridge-tunnel transitions✓ Proven in Hangzhou-Quzhou/Hangzhou-Shaoxing-Taizhou HSR
Turnkey Services
HCR delivers end-to-end heavy girder construction solutions:
Customized Equipment: 70-year expertise ensures cost-effective machinery
Technical Support: Design documentation, third-party drawing review, on-site supervision
Engineering Consultation: Complimentary troubleshooting for complex scenarios
Portfolio: DJ1000 series deployed in multiple Chinese mega-projects