Created on 05.06

220T DOUBLE TRUSS ERECTOR POWERS 4 YEARS OF MALAYSIAN INFRASTRUCTURE

0
Custom-delivered in 2019 to ASTANA SETIA for the Setiawangsa Pantai Expressway, our 220-Tonne Capacity Double Truss Beam Erector (span: 67 metres) has become a linchpin in Malaysia’s heavy infrastructure development.
0
Four years post-delivery, this engineering workhorse continues to operate flawlessly across successive national projects. Despite surface wear from 20,000+ operational hours, its core systems maintain peak performance reliability. Currently deployed at Kuala Lumpur’s Brickfield River Crossing (2023), the erector demonstrates unparalleled longevity in challenging environments.
0
Product Superiority:
▶ Continuous Duty Proof: 4+ years of multi-project service with zero structural refits
▶ Mega-Lift Capability: Industry-maximum 220T lift capacity at full span
▶ Future-Adaptive: Modular design supporting redeployment across expressway/rail/bridge projects

HOME

Our self-developed DJ series is now on sale

TIMELINE WITH US

OUR CLIENTS

our Partner

PRODUCTS

ABOUT  US

CONTACT US

Fully Automatic Brick Making Machine

Semi-Automatic Brick Making Machine

Hollow Brick Machine

Hydraulic Brick Making Machine

Company Profile

Our Team by the numbers

Who We Are

Contact Us

Price is in US dollars and excludes tax and handling fees

© 2024 LingXi Ltd. Trademarks and brands are the property of their respective owners.

Global Presence