Created on 05.08

HCR'S DOUBLE TRUSS BEAM LAUNCHER COMPLETES 6% SLOPE PC GIRDER ERECTION FOR DALA BRIDGE

HCR has completed PC girder erection on a uniform 6% slope for the DALA Bridge project using its Double Truss Beam Launcher. The 1,868-meter cable-stayed bridge consists of 577-meter Approach 1601-meter Approach 2, and 690-meter main span, featuring bored pile foundations4-meter-wide sidewalks, and 75-tonne maximum loading capacity.
0
Commissioned by Utracon, the project overcame complex technical challenges including consistent 6% slope control, construction of the stay-cabled central span, and girder erection at 35-meter pier height – the structure's maximum elevation.
0
The successful execution demonstrates the operational stability of HCR's equipment in demanding conditions. Precision engineering enabled efficient completion of this critical construction phase.
0
We extend professional recognition to the engineers and construction teams whose collaborative expertise transformed complex slope challenges into a replicable technical achievement.
0
0

HOME

Our self-developed DJ series is now on sale

TIMELINE WITH US

OUR CLIENTS

our Partner

PRODUCTS

ABOUT  US

CONTACT US

Fully Automatic Brick Making Machine

Semi-Automatic Brick Making Machine

Hollow Brick Machine

Hydraulic Brick Making Machine

Company Profile

Our Team by the numbers

Who We Are

Contact Us

Price is in US dollars and excludes tax and handling fees

© 2024 LingXi Ltd. Trademarks and brands are the property of their respective owners.

Global Presence