Gypsum board in wet areas: where standard board stops.
A bathroom ceiling is not a kitchen splashback, and a shower wall is not a standard partition. The board, joint treatment and ventilation have to be selected as a system.
These are the questions we ask before quoting a wet-area package. They usually decide whether the job needs moisture-resistant board, cement board or a tanking system.
1. Is it a splash zone or a wet zone?
A splash zone — a vanity wall or a kitchen backsplash — sees occasional water. A wet zone — a shower, a bath surround or a floor-level wet room — sees repeated direct water and needs a different detail. The board alone does not make the area waterproof; the tanking and joint system does.
2. What is behind the board?
Moisture-resistant gypsum board needs a dry, ventilated cavity. If the substrate is solid or the cavity cannot dry, fiber-reinforced cement board is often the safer choice. The fixing pattern and movement joints follow the substrate, not the board catalogue.
3. Which joints will see water?
Joint compound is not a waterproofing membrane. In a wet zone, the joint and corner detail should be part of the tanking system, with the correct tape, sealant and reinforcement. Standard joint compound belongs to the dry side of the assembly.
4. How will the cavity dry?
A sealed cavity with no ventilation can hold moisture even when the board is moisture-resistant. Plan the extract, the gap at the base and the service penetrations before the board goes on.
- Define splash zone vs wet zone
- Confirm substrate and cavity ventilation
- Specify tanking and joint system together
- Use cement board where drying is limited
- Protect cut edges and penetrations