Blog | Drywall, Steel Keel & Acoustic System Notes
BNBM · Dragon Brand · Shanghai
Building materials testing laboratory

Notes from the plant floor.

Practical writing for the people who specify, buy and install drywall systems — board selection, keel layout, acoustics and export packing.

Fiber-reinforced cement board pallets for wet-area projects

Gypsum board in wet areas: where standard board stops.

A bathroom ceiling is not a kitchen splashback, and a shower wall is not a standard partition. The board, joint treatment and ventilation have to be selected as a system.

These are the questions we ask before quoting a wet-area package. They usually decide whether the job needs moisture-resistant board, cement board or a tanking system.

1. Is it a splash zone or a wet zone?

A splash zone — a vanity wall or a kitchen backsplash — sees occasional water. A wet zone — a shower, a bath surround or a floor-level wet room — sees repeated direct water and needs a different detail. The board alone does not make the area waterproof; the tanking and joint system does.

2. What is behind the board?

Moisture-resistant gypsum board needs a dry, ventilated cavity. If the substrate is solid or the cavity cannot dry, fiber-reinforced cement board is often the safer choice. The fixing pattern and movement joints follow the substrate, not the board catalogue.

3. Which joints will see water?

Joint compound is not a waterproofing membrane. In a wet zone, the joint and corner detail should be part of the tanking system, with the correct tape, sealant and reinforcement. Standard joint compound belongs to the dry side of the assembly.

4. How will the cavity dry?

A sealed cavity with no ventilation can hold moisture even when the board is moisture-resistant. Plan the extract, the gap at the base and the service penetrations before the board goes on.

  • Define splash zone vs wet zone
  • Confirm substrate and cavity ventilation
  • Specify tanking and joint system together
  • Use cement board where drying is limited
  • Protect cut edges and penetrations
Send a wet-area detail
Dragon Brand light-gauge steel keels in production

Steel keel spacing: the board sets the rhythm.

Stud spacing is often treated as a default — 400 mm or 600 mm — but the board orientation, the partition height and the openings should decide the layout. A frame that is tight enough for the board may still be too weak at a door or a service riser.

Start with the board: which direction will it run, where will the joints fall, and what edge detail is specified? Then check the stud and track gauge against the height and the load. Finally, add the openings, junctions and movement joints.

  • Board direction and joint positions first
  • Stud spacing matched to board width
  • Track and stud gauge checked against height
  • Openings framed with additional studs
  • Movement joints at long runs and changes of substrate
A good keel layout is not the one that uses the fewest studs. It is the one the board can be fixed to without compromise.
See steel keel options
Decorative acoustic ceiling system in a showroom

Perforated gypsum or mineral wool? Two different acoustic jobs.

Both products are sold as “acoustic ceilings”, but they solve different problems. Mineral wool board is a porous absorber: it reduces reflected sound inside the room. Perforated gypsum board is a resonant absorber: its performance depends on the perforation, the backing and the plenum behind it.

For a general office, a school or a restaurant, mineral wool board is often the straightforward choice. For a corridor, a feature ceiling or a space where a monolithic gypsum finish is required, perforated board can give absorption without changing the visual language.

  • Mineral wool: broad absorption, simple grid installation
  • Perforated gypsum: monolithic finish, pattern and backing options
  • Check the plenum depth and backing before quoting
  • Confirm NRC and fire performance by model
  • Coordinate lights, diffusers and access panels
Compare acoustic boards
Wrapped gypsum board pallets prepared for loading

Export packing for boards and keels: agree five things first.

Board is heavy, brittle at the edges and sensitive to moisture. Keel is long, bundled and easy to bend if it is not supported. Most arrival damage is decided by the packing plan, not by the shipping line.

  • Pallet footprint and maximum stack height
  • Edge protection and corner boards
  • Moisture barrier and ventilation path
  • Keel bundle support and strapping
  • Mixed-load sequence and shipping marks

For a mixed container, load the heavy board pallets first and keep the keel bundles supported along their length. Label each pallet by block or floor so the site team can receive the package without opening every unit.

Packing is part of the system. If the edges arrive crushed, the board is not the product you sold.
Ask about export packing

What we write about

Four topics, one goal: fewer site surprises.

If there is a detail you would like us to cover from the factory side, send it with your next enquiry.

01

Board selection

Standard, moisture-resistant, fire-resistant and cement board.

02

Steel framing

Stud spacing, track details, openings and movement joints.

03

Acoustic ceilings

Mineral wool, perforated gypsum, backing and plenum design.

04

Export & packing

Pallets, moisture protection, mixed loading and shipping marks.

Have a project in mind?

Send the drawing. We will do the takeoff.

Board schedule, ceiling plan, wall section and target date are enough to start a system proposal.

Talk to our team