How to size a line array for a room you have never visited.
Most line-array enquiries arrive as a room photo and a budget. That is enough to start a conversation, but not enough to specify an array. The missing information is almost always the same five things.
Get these right and the cabinet count usually follows without drama. Guess them and the system is either too short, too tall or impossible to trim.
1. Start with the geometry
Ask for a plan and a section drawing, not a photo. The plan gives width and depth; the section gives floor-to-grid height, balcony positions and the trim height available above the stage. A line array is a vertical device, so the section drawing matters more than any other document.
2. Define the coverage, not the model
Mark the first and last seat that must be covered, plus any balcony or delay position. The vertical angle between those points, together with the trim height, tells you how much splay range the array needs. Model numbers come later.
3. Agree the programme and the target level
Speech reinforcement, worship music, rock touring and playback have different crest factors and different low-frequency needs. State the programme and the level expected at the last row. A target without a distance is not a target.
4. Decide the subwoofer ratio before the amplifier
The subwoofer count should follow the music programme and the room, not the number of top boxes. For a speech-led auditorium, one subwoofer per two or three top boxes may be enough. For contemporary music, plan for more and check the power and processing headroom.
5. Confirm rigging and transport
A flown array needs a structural point, a fly frame, a bumper and a way to get the array to trim height. If the venue has no rigging point, the design changes. If the system tours, caster boards and covers become part of the specification, not an afterthought.
- Plan drawing with dimensions and scale
- Section drawing with trim height and balcony
- Coverage start and end points
- Programme type and target level
- Rigging points, power and transport access