Cross-border Project Service Process

End-to-end customized solutions for the global market

Core Products and Internationalization Service Model

Recycling symbol on a blue gradient background.

Small and Medium Factory Specific

High Salt Tolerance Skid-Mounted Equipment

Anti-corrosion Coating + Quick Installation

High Salt Membrane Module + Sand Prevention Design

Petrochemical/Mining Area Specific

Integrated Wastewater Reuse Equipment

Read More

Read More

Industrial Park Specific

Water Resource Reuse Scenarios

200-500m³/d Enhanced Skid-Mounted Equipment

50-200m³/d Standard Skid-Mounted Equipment

Reuse Rate 80%+ Low Energy Consumption

Modular Expansion + Remote Monitoring

Read More

Read More

Service Process

1. Overseas Demand Communication

Understand customer's industry, processing volume, local compliance requirements, and pain points (e.g., high temperature/high salinity conditions) via WhatsApp/email/video conference.

Fill out the requirements form → Assign exclusive overseas consultant → Preliminary requirement assessment.

2. Free Water Quality Sampling

Sampling data sent by local testing companies, or on-site sampling by our cooperating agents, or customers sending samples to the nearest testing center, with response and processing within 24 hours.

Sampling Data/Guidance → Sample Testing (15 Core Indicators) → Test Report Generation

3. Process Testing

Conduct small-scale / pilot tests based on water quality data to verify the adaptability of skid-mounted equipment and optimize process parameters and equipment configurations (e.g., anti-corrosion, high-temperature resistance adjustments).

Process design → Experimental verification → Equipment debugging → Parameter optimization.

4. Customized Overseas Solutions

Develop a comprehensive solution including "equipment selection + installation cycle + cost budget" based on local policies, working conditions, and transportation costs, providing multi-language versions of the system.

Solution design → Cost calculation → Solution demonstration and confirmation.

5. Overseas Transportation

6. Local Construction and Installation

7. Debugging and Acceptance

8. Operation and Maintenance Support

Installation completed by the company with local partner teams or Chinese engineers dispatched by the company, taking 1-3 days, adapted to local construction standards and safety regulations.

On-site survey → Equipment hoisting → Pipe connection → Power-on debugging.

Compatible with 20ft/40ft containers, providing customs clearance document assistance and logistics tracking, with customized docking at the core port closest to the installation site.

Equipment Packaging → Logistics Arrangement → Customs Clearance Assistance → Logistics Tracking

Conduct a 72-hour continuous operation test, issue a water quality test report, ensure COD removal rate and compliance with standards, and assist customers in obtaining local environmental certifications.

Continuous operation test → data detection → compliance acceptance → certification assistance

Provides 24-hour WhatsApp remote diagnosis, annual on-site maintenance, and overseas spare parts warehousing to ensure long-term stable equipment operation.

Remote Diagnosis → Spare Parts Supply → Regular Maintenance → Technical Updates

Back to Home

About Us

Core Business

Benchmark Cases

Service Process

News and Consultation

Contact Us

Service Content

Industrial Circulating Cooling Water Systems

Industrial Wastewater Treatment and Reuse

Municipal Wastewater Treatment and Upgrade Renovation

High-Quality Reclaimed Water Reuse

Drinking Water Purification and Tap Water Plant Upgrade

Membrane Water Treatment and Separation Systems

Water Treatment System Outsourced Operation and Technical Services

Phone
QQ