Focused work behind every single dose.

About SteriDose Labs

We connect project intent, packaging format and manufacturing readiness for international skincare teams evaluating single-dose programs.

Project coordination and international communication.

Format, process and supporting evidence are checked against the actual brief.

Facility scope, documentation and current applicability are confirmed before commercial commitment.

Guangzhou, Guangdong

Project-led review

Manufacturing access is reviewed with the project.

M01-01-bfs-production-environment.jpg

A focused company

Clear decisions matter before the production line does.

Start with what the product needs to do.

Understand the intended application

Review formula status and fill volume

Compare format, process and pack-out needs

The package should follow the formula, the intended use and the way the dose needs to be delivered. Our role is to keep those decisions connected from the brief onward.

Before samples or production planning, we bring the key project inputs into one practical review.

M02-01-incoming-material-inspection.jpg

Facilities & locations

The site story is presented by function, so customers can see how project coordination, production controls and laboratory support connect.

One project, three connected roles in Guangzhou.

01 · PANYU, GUANGZHOU

Project coordination

Project brief and intended-use review

Format and production coordination

Documentation and timeline follow-up

International communication, initial brief review, format comparison, documentation follow-up and commercial coordination stay with the SteriDose Labs project team.

M03-01-project-records-coordination.jpg

02 · HUANGPU, GUANGZHOU

BFS production controls

Incoming material and packaging checks

In-line leak testing and automatic weighing

Final inspection, pack-out and storage

Facility materials describe continuous BFS forming, filling and sealing, supported by an ISO 8 environment and ISO 5 filling core. Relevant controls are reviewed against the project route.

M04-01-huangpu-bfs-production-controls.jpg

03 · BAIYUN, GUANGZHOU

Laboratory & manufacturing support

Class 100,000 GMPC clean environment

Separated personnel and material routes

Clean corridors and air-shower entry

Current materials show production areas, laboratories, QA/QC functions, water treatment and controlled-access manufacturing support. Applicable capability is confirmed per project.

M05-01-baiyun-qaqc-laboratory.jpg
M06-01-inline-leak-test-checkweigh.jpgM06-02-qaqc-analytical-testing.jpgM03-01-project-records-coordination.jpg

Controls, records and scope stay connected.

Process controls

Laboratory support

Project records

Evidence boundary

QUALITY EVIDENCE

Quality language should show what is reviewed without turning facility materials into unverified product claims.

Forming, filling, sealing, leak checks, weighing, appearance review and pack-out are considered according to the selected route.

Sample, viscosity, pH and appearance review may support formula and production decisions where applicable.

Specifications, pilot or trial records, inspection records and supporting documents are grouped around the actual project scope.

Certificate holder, facility, scope and current validity are confirmed for the selected project. Facility documents and production images do not constitute product approval.

Quality is built through connected environments.

Inspection and pack-out

Cleanroom access

Water treatment

INSIDE THE OPERATION

The production floor is only one part of the system. Final inspection, controlled entry and utility support remain connected to the work.

Appearance and presentation are reviewed before release.

People and material flow support controlled production areas.

Supporting utilities form part of the manufacturing environment.

Three operational scenes. One continuous project path.

Huangpu: BFS processing and in-line controls. Baiyun: QA/QC, clean areas and supporting utilities.

M07-01-final-inspection-packout.jpgM07-02-cleanroom-entry.jpgM07-03-water-treatment.jpg

Start a conversation

Bring us the project before the format is fixed.

Project contact

Email

WhatsApp

Location

Share the formula status, intended use and approximate fill volume. We can identify missing inputs before samples or production planning.

Guangzhou, Guangdong, China · International project coordination · UTC+8

Confidential formula details can wait until an NDA is in place.

Explore programs

Request a project review