In-house Testing Laboratory | Splice Closure QC Lab — Impact, Salt Spray, Vibration | DEJU

In-House Testing Laboratory — Where Every Splice Closure Proves Itself Before Shipping

Every fiber optic splice closure leaves our Ningbo factory after passing mechanical, environmental and sealing tests in our own QC lab. We follow IEC 60794-1, IEC 61300 and Telcordia GR-771 methods — no outsourcing of routine testing.

Programmable thermal humidity cycling test chamber in DEJU QC laboratory
Mechanical ImpactDrop TestSalt SprayVibrationTensile PullCrush TestWater ImmersionThermal CyclingIP68 Sealing

Why We Test In-House

A splice closure is the only sealed joint between two fiber cables in an outdoor network. If it leaks, the whole feeder segment goes dark. For Latin American deployments — coastal humidity, Andean temperature swings, dusty rural poles, underground manholes — the closure must survive 20+ years of abuse.

Relying only on supplier-type approvals is not enough. We run 100% routine inspection on every batch and sample-level full-environmental testing before mass production. Our lab is directly on the factory floor, so engineering, tooling and QC are in the same building — when a test fails, we fix the mold the same week.

12+
Test categories
100%
Sealing check on every batch
IP68
Rated sealing level
20 yr
Design life

Mechanical & Physical Tests

1. Mechanical Impact Test

Standard: IEC 60794-1-2 / GR-771. Sample closure is subjected to guided-drop impacts from 1 m height on concrete, repeated at multiple angles (lid, side, bottom). After impact, no crack on housing and sealing must still hold.

Why it matters: Covers drops during installation on aerial poles and accidental impact by tools or falling branches.

2. Drop Test (Free Fall)

Standard: IEC 61300-2-10 Method A. Completed closure (with cable stub) is dropped 75 cm at (45±2)°C once onto a steel plate. Post-test air-pressure decay must stay within spec — no seal break.

Why it matters: Simulates a technician dropping the closure from a ladder during aerial FTTH work.

3. Tensile / Axial Pull Test

Standard: IEC 60794-1 Method E1. Closure is pulled axially with ≥800 N for 1 minute on each cable port. No cable slip out of the seal, no fiber attenuation increase.

Why it matters: Aerial closures hang under tension; a slipped cable = 2 km of dark fiber.

4. Crush / Compression Test

Standard: IEC 60794-1-2 Method E3. Closure is compressed at 2000 N / 100 mm for 1 minute. No permanent deformation; post-test sealing and fiber routing must stay intact.

Why it matters: Underground closures are under soil pressure; aerial closures get hit by traffic or construction.

5. Vibration Test

Standard: IEC 60068-2-6 / IEC 61300-2-1. Frequency sweep 10–500 Hz, up to 3g acceleration, 3 orthogonal axes. Post-vibration: no loose parts, no seal leak, attenuation stable.

Why it matters: Covers wind-induced pole sway, vehicle vibration near duct routes, and ongoing micro-motion in aerial installations.

Environmental & Sealing Tests

6. Salt Spray / Salt Mist Test

Standard: IEC 60068-2-52. 5% NaCl solution, 35°C, continuous spray for 48–96 hours. Post-test: no corrosion on metal hardware (stainless clamps, brackets), sealing still holds.

Why it matters: Critical for coastal Chile, Peru and Brazil — salt air destroys unprotected metal parts within a year.

7. Water Immersion & Sealing Test (IP68)

Method: Closure is pressurized with dry air (typically 10 kPa or 50 kPa) and submerged in a water tank for 24 hours, or immersed under 1 m water column. No bubbles, no pressure drop.

Why it matters: The #1 field failure mode of buried/underground closures is water ingress after monsoon rain. We pressure-test every batch.

8. Thermal Cycling / Temperature Shock

Standard: IEC 60068-2-14. Closure cycles between -40°C and +65°C (or -10 to +60°C per customer spec) for multiple cycles, with controlled humidity. No housing deformation, seal remains elastic.

Why it matters: Andean deployments (Bolivia, Peru highlands) see -10°C at night and +40°C daytime; desert areas swing even wider.

9. Dust Protection Test (IP6X)

Method: Sealed closure placed in a dust chamber with talcum powder for 8 hours under vacuum. Opening the lid afterward must show zero dust inside on the splice trays.

Why it matters: Manhole and rural aerial environments are dusty; dust on splice trays causes attenuation drift over years.

10. UV Aging Test

Method: Outdoor-grade PC/PP closure samples are exposed to UV weathering chamber for 500+ hours. Post-test: housing does not become brittle, color change ΔE below 3.

Why it matters: White or black outdoor housings degrade under tropical sun; we verify UV stabilizer loading before we approve a batch for coastal/desert shipping.

Optical & Final Quality Checks

11. OTDR Insertion Loss Measurement

Finished splice trays are measured on an EXFO OTDR at 1310 / 1550 nm. Each splice point must show < 0.05 dB fusion loss; return loss consistent with clean SC/APC polishing.

12. Visual & Dimensional Inspection

Caliper check on outer dimensions, port count, tray stacking; visual check for molding defects, flash, discoloration, missing labels. AQL 1.5 per ISO 2859.

Test Standards We Reference

StandardScope
IEC 60794-1-2Optical fiber cable — basic optical cable test procedures (mechanical / environmental)
IEC 61300-2-10 / 2-1Fiber optic interconnecting devices — drop, vibration tests
IEC 60068-2-52 / 2-6 / 2-14Salt spray, vibration, thermal cycling
Telcordia GR-771Generic requirements for closures in outside plant
YD/T 814 / GD/J 105China telecom industry method for fiber optic splice closures

Factory QC Flow

Salt spray corrosion test chamber ASTM B117 for outdoor splice closure hardware Electromagnetic vibration test bench 3-axis testing of fiber optic closure

Need a Test Report for Your Project?

For distributor tenders, operator certification and project submissions, we can provide:

Tell us which SKU you need and which standards your tender requires — we will send the matching report within 24 hours.

📧 Email [email protected] for test reports & sample closures
Contact us